Hesperia Dam Design Services Awarded

Hesperia Dam Design Services Awarded

Proposed Straight Crest Dam with Four Gates (Option 2) superimposed over current site   Work Session November 10, 2025 After the September 16, 2025 Dam Open House held at the Hesperia High School, the Village Council and other Village staff met on November 10,...
White River: A Vision for the Future

White River: A Vision for the Future

OUR LATEST NEWS RELEASE   White River: A Vision for the Future Hesperia, MI – September 24, 2025   The White River has long been one of West Michigan’s most treasured natural resources, offering miles of pristine habitat, scenic beauty, and world-class...
Hesperia Dam Rehabilitation Project

Hesperia Dam Rehabilitation Project

THE HESPERIA DAM REHABILITATION PROJECT By Mark HeyingSeptember 17, 2025 An event was held September 16, 2025, by the Village of Hesperia, at the high school gymnasium, which was called the ‘Hesperia Dam Rehabilitation Project’.  A circular area was cordoned off,...
An Encouraging Trend

An Encouraging Trend

An Encouraging Trend By Dr. Thomas TisueSeptember 28, 2025 The WRWP assists Trout Unlimited in maintaining automated temperature data collection stations at 3 Mile Road and at the White River Baseline site. These sites are a few miles above and below the dam at White...