Dams and Impoundments within the White River Watershed

White River Watershed Partnership’s position on dams and impoundments
As the WRWP mission points out, our organization promotes restoration of the natural resources of the Watershed. We find that many of the remaining dams in our watershed, in particular the two biggest ones that were built years ago to get logs to market, no longer serve this initial function. In fact, for three quarters of a century the White Cloud and Hesperia Dams have not served their second, producing hydroelectricity.
For some, their hometown dam and impoundment engender pride and nostalgia. Like the Golden Gate Bridge to San Francisco, dams and lakes become intertwined with a town’s identity. Though tough to admit, dams do get old and all lakes gradually fill in. As you might expect, WRWP advocates for a river ecosystem that is naturally self-sustaining.
What’s on this page
The content here is organized by dam/impoundment location, then chronologically, with the most recent link appearing first. In addition, at the bottom, there is general information concerning dams, impoundments, hydrology, hydrogeology and hydraulics documents.
After the name of each dam and impoundment, there is a summary from the information provided on the Michigan Dam Inventory. Each dam is cataloged with “MI” followed by a six-digit number. Next is the dam’s longitude and latitude.
Dam description explained
The “Downstream Hazard Potential” is a determination made by engineers within EGLE Dam Safety Unit, not of the dam itself, but of the risk to life and property should the dam fail. There are three ratings in Michigan law, and corresponding with each is the hydronic/hydraulic capacity requirements for the gates and spillways. “High Hazard Potential” dams are to be able to pass the greater of the largest known flood event, or the calculated 200-year storm. The same is required of those rated “Significant.” For those rated “Fair,” the design storm is a 100-year.
Dams in different locations are engineered to meet the same common criteria (i.e., 200-year storm), but that is by no means the same inches of rainfall. White Cloud and the Mojave Desert both have 200-year storms. Check out the YouTube videos below.
In designing a new dam or assessing an existing one, engineers run models that turn the 200-year storm into the quantity and rate that the water will arrive at the impoundment. Even when the 200-year storm events are nearly the same, the dams may need to be very different. Take the example of White Cloud Dam and Rockford Dam, less than 40 miles apart. To handle an identical storm, each dam has differing hydraulic requirements. The total volume (cubic feet) and the rate at which it arrives are dependent on the area (square miles) and characteristics of the contributing upstream subwatershed. In addition, differing land uses, one rural areas (above White Cloud) and the other urban/suburban areas (above Rockford), have far different runoff coefficients. Differences in soil type may vary the amount of absorption. After a 20 minute 3-inch downpour in Rockford, there may will be more water going through the gates that at any point of a 3-inch slow 24-hour soaker passing White Cloud Dam. Gates, spillways, freeboard and emergency spillways all should be designed to the location’s specific requirements.
There are two significant hydraulic values associated with dams. Maximum Rate is the amount the dam gates and spillway actually can handle. The other, Design Flood Rate, is the calculated rate water needs to pass through the dam during the Design Flood. In Michigan, both are measured in cubic ft. / sec. When the Maximum Rate is less than the Design Flood Rate, the dam is subject to overtopping during the legally set common criteria. When the actual capacity is below the design flow rate, a storm occurring more frequently will cause the dam to crest. Based on the Feasibility Report for White Cloud Dam and the Emergency Action Plan for Hesperia Dam, along with observations, both dams have overtopped in storms less than the 200-year event.
Regulatory Authority is the reference to Michigan’s Natural Resources and Environmental Protection Act, 1994, as amended. Part 315 dams have heights at least six feet or an impoundment over 5 acres during the design flood. Part 307 dams are those where a circuit court has issued an order establishing a legal lake level. Some small dams in the inventory are not covered by either section of the law, and are shown as either “Inventory” or “Not under state jurisdiction.” Within our watershed there are no hydroelectric dams, such as Hardy and Croton Dams on the Muskegon River, which are regulated by the Federal Energy Regulatory Commission (FERC).
All but the smallest of dams are routinely inspected by either the State or by a qualified engineer. The inspections are either visual or more detailed. The detailed examinations follow a format developed by the US Army Corps of Engineers, and under Michigan law are referred to as Disposition Feasibility Studies. The Condition Assessments made after these inspections fall into three categories: Satisfactory, Fair or Poor. Some of the smallest dams are shown as “Not Rated.”
The odds
To some, asking a dam to be designed to meet a 200-year storm seems excessive. But remember, even the most experienced scientists and engineers, using the best tools available, resists predicting when and how a dam will fail. Fortunately those same specialists can determine with precision the intensity, duration and frequency of a 200-year storm, somehow with about 30 years of weather history. To that, the public’s investment in a dam should last 50 years, ideally longer. Overall, in what works out to be an 80 year span, a lot can change. Changes nearly all increasing the water over the dam. What started out as having a 0.5% chance of happening just keeps getting more likely.
Map of Dams and Impoundments within the White River Watershed

1. White Cloud Dam [Municipal Power Plant Dam] and Lake White Cloud [White Cloud Dam Impoundment] on South Branch White River
[MI00526; 43.546, -85.767; Downstream Hazard Potential: High; Emergency Action Plan Required; Owner: City of White Cloud; Regulatory Authority: Part 315; Description: Retired hydro, earth concrete structure with height of 18.9 ft., head of 14.4 ft., normal freeboard of 3.5 ft., impoundment surface area of 50 acres, drainage area of 81.4 sq. mi.; Design Flood: 200 yr. with Design Flowrate of 2,600 cubic ft. / sec.; (for pre 6/26/2025 drawdown Max Rates of the dam, see White Cloud Dam Feasibility Study (February 14, 2025) page 176 of the pdf file. “The dam can safely convey up to the 2-year flood event.”); Condition Assessment: Poor]
View Detailed information on White Cloud Dam and Lake White Cloud
2. Robinson Lake Level Control Structure and Robinson Lake on Robinson Creek (South Branch of White River)
[MI01010; 43.539, -85.86; Downstream Hazard Potential: Low; Owner: Robinson Lake Improvement Assoc.; Regulatory Authority: Part 307; Description: Lake level control structure with height of 3 ft., head of 1 ft., impoundment surface area of 133 acres, drainage area of 14.8 sq. mi.; Condition Assessment: Fair; Meets applicable hydrologic and seismic regulatory criteria.]
3. Robertson Dam on Tributary to South Branch White River
[MI04054; 43.568, -85.984; Downstream Hazard Potential: Low; Owner: Private.; Regulatory Authority: Part 315; Description: earth structure with height of 15 ft., impoundment surface area of 12 acres, drainage area of 0.14 sq. mi.; Design Flood: 100 yr.; Condition Assessment: Fair.]
4. Hesperia Dam and Hesperia Pond on South Branch White River
[MI00678; 43.573, -86.041; Downstream Hazard Potential: Significant; Owner: Village of Hesperia; Emergency Action Plan Required; Regulatory Authority: Part 315; Description: Earth dam with last major reconstruction in 1977, retired hydro with height of 11 ft., head of 8 ft., impoundment surface area of 50 acres, drainage area of 196 sq. mi., max discharge of 3,524 cubic ft / sec; Design Flood: 200 yr. with 4,400 cubic ft. / sec.; Condition Assessment: Poor]
View Detailed information on Hesperia Dam and Hesperia Pond
5. Minnie Lake Dam and Minnie Lake [Pond] on Mena Creek
[MI00185; 43.628, -85.899; Downstream Hazard Potential: Significant; Emergency Action Plan: Required; Owner: Huron-Manistee National Forests; Regulatory Authority: Part 315; Description: Gravity earth dam completed in 1939 with height of 17 ft., and 9 ft. head; impoundment surface area of 26 acres, drainage area of 9.8 sq. mi., max discharge of 1000 cubic ft / sec; Design Flood: 200 yr. with 430 cubic ft. / sec.; Condition Assessment: Fair]
6. Uganski (Seng) Dam [Seng Dam] and Ubanski Pond on a Tributary to South Branch White River
[MI00338; 43.559, -86.971; Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Part 315; Description: Earth dam for recreation with height of 11 ft., and 10 ft. head; impoundment surface area of 6.5 acres, drainage area of 0.3 sq. mi., max discharge of 28 cubic ft / sec; Design Flood: 100 yr. with 80 cubic ft. / sec.; Condition Assessment: Satisfactory.]
7. Cushman Creek Dam on Cushman Creek
[MI00828; 43.522, -86.085; Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Inventory; Description: Earth dam for recreation with height of 5 ft., and 5 ft. head; impoundment surface area of 12 acres; Design Flood: 100 yr.; Condition Assessment: Not rated.]
8. Stopczynski Dam on Robinson Creek (North Branch of the White River)
[MI02121; 43.607, -86.247; Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Inventory; Description: Gravity dam for recreation with height of 5 ft., and 2 ft. head; impoundment surface area of 1 acre; Not under state jurisdiction; Condition Assessment: Not rated.]
9 Cleveland Lake Dam and Cleveland Lake on Cleveland Creek [MI00714; 43.442, -86.23; Downstream Hazard Potential: Significant; Emergency Action Plan: Yes; Owner: Owasippe Scout Reservation; Regulatory Authority: Part 315; Description: Gravity earth dam for recreation with height of 21 ft., and 13 ft. head; impoundment surface area of 90 acres, drainage area of 9.8 sq. mi., max discharge of 590 cubic ft / sec; Design Flood: 200 yr. with 800 cubic ft. / sec.; Condition Assessment: Satisfactory, Meets applicable tolerable risk criteria.]
10. Browns Pond Dam and Browns Pond on Sand Creek
[MI00228; 43.46, -86.259; Downstream Hazard Potential: Significant; Emergency Action Plan: Yes; Owner: Blue Lake Township, under the authority of Muskegon County DPW; Regulatory Authority: Part 307/315; Description: Earth dam built in 1844, now used for recreation with height of 16 ft., and 11.5 ft. head; drainage area of 7.82 sq. mi., max discharge of 412 cubic ft / sec; Design Flood: 200 yr. with 330 cubic ft. / sec.; Condition Assessment: Satisfactory.]
11. Silver Creek Dam and Mill Pond on Silver Creek
[MI00232; 43.437, -86.333; Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Inventory; Description: Earth dam built in 1952, now used for recreation with height of 10 ft., and 8 ft. head; surface area of 18 acres; drainage area of 1.59 sq. mi., max discharge of 70 cubic ft / sec; Condition Assessment: Poor, Deficiency recognized.]
12. North Star Fisheries Dam #1 on Carlton Creek
[MI01653; 43.433, -86.299; Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Not under state jurisdiction; Description: Earth dam built in 1950, for recreation with height of 12 ft., and 12 ft. head; surface area of 2 acres; Condition Assessment: not rated.]
13. North Star Fisheries Dam #2 on Carlton Creek
[MI01654; 43.438, -86.337; Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Inventory; Description: Earth dam built in 1952, for recreation with height of 12 ft., and 12 ft. head; surface area of 3 acres; Condition Assessment: not rated.]
14. Whitehall Millpond Dam [Millpond Dam] and Mill Pond on Tributary to South side of White Lake
[MI100669, 43.389, -86.354; Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Part 315; Description: Earth dam built in 1940, now used for recreation with height of 14 ft., and 13 ft. head; surface area of 7 acres; drainage area of 1.99 sq. mi.; Maximum Discharge: 260 cubic ft. / sec.; Design Flood 100 yr.; Design flow rate 180 cubic ft. / sec.; Condition Assessment: Satisfactory, meets applicable tolerable risk criteria.]
15. Olson Dam on Mill Pond Creek
[MI01081, Muskegon Co., 43.383, -86,342, Downstream Hazard Potential: Low; Owner: Private; Regulatory Authority: Inventory; Description: Earth dam built in 1970 with height of 8 ft., and 5 ft. head; surface area 1 acre; Condition Assessment: not rated.]
General Information
Michigan Dam Inventory – EGLE’s Map database of dams across the entire State.
,
Practical Engineering: What Really Happened At Edenville and Sanford Dams? (2022) – This YouTube (14:14 minutes) by Grady Hillhouse is an overview of why these two Michigan dams failed, but also how earthen dams are engineered and constructed, along with the social difficulties of dam ownership.
If this piques your interest, check out the links below:
Practical Engineering: How Different Spillway Gates Work
Practical Engineering: All Dams are Temporary
Practical Engineering: The 100 Year Flood Is Not What You Think It Is (Maybe)
Practical Engineering: Why Fish Ladders (Mostly) Work.
Final Forensic Report on 2020 Edenville and Sanford Dam Failures Released (May 4, 2022) – Prepared by an independent forensic team, under the auspices of Association of State Dam Safety Officials, to determine not only the engineering failures of the structures of these two dams, but also other factors over the 95-year existence that contributed. While not specific to the two former hydroelectric dams on our White River, there are important lessons to be learned.
Michigan Dam Safety Task Force Report (February 12, 2021) – Link to EGLE website where the report and transmittal letter to Governor Whitmer can be found (59 page pdf). Following the failure on May 19, 2020, of the Edenville Dam and subsequently the Sanford Dam on the Tittabawassee River in Midland County, the State undertook several steps to reduce the risk posed by the 2,600 dams in Michigan. Shortly afterwards, a 19-member Michigan Dam Safety Task Force was formed, and by February of 2021 had made 86 recommendations in eight key areas.
Among the taskforce members were Evan Pratt (Chair), Water Resources Commissioner, Washtenaw County; Abby Watkins, Director of Emergency Services, Newaygo County; Dr. Marty Holtgren, as Executive Director, Muskegon River Watershed Assembly; and Dr. Bryan Burroughs, Executive Director, Michigan Trout Unlimited.
The executive summary states, “current custodians … have inherited an aging inventory that requires comprehensive and immediate attention. The Task Force recommended a revolving loan and grant program to finance dam maintenance that prioritizes risk reduction. They state that dam removal reduces the greatest amount of risk while also providing substantive ecological benefits. In addition, they recommend providing funding for dam removal when owners are unwilling or unable to meet their obligations for maintenance and insurance.
In addition to license dams, the task force recommended that dam owners maintain adequate financial security such as insurance, and setting aside sufficient funds for maintenance and ultimate removal of dams. When a license period is up, the task force recommended the renewal should include a comprehensive review to determine if the dam should continue to exist. If the dam owner has failed to maintain, operate and fund a dam during the term of a license, the license would be revoked and the removal process should begin. The task force recommended dam owners be required to provide financial security to cover potential liabilities in the event of catastrophic dam failure. No longer than ten-year intervals should exist between comprehensive reviews conducted by a qualified team (dam feasibility study).
As to issues of compliance and enforcement, the task force recommended improvements at EGLE: prioritization of compliance and enforcement, providing clear timelines for actions to alleviate significant risks posed by high and significant hazard dams (White Cloud and Hesperia), and use water-level lowering orders as a compliance tool to reduce the safety risks by long unmaintained, deteriorating dams and unresponsive dam owners. The task force recommended every dam have an Emergency Action Plan.
The Report states the existing level of staff are spread too thin and the critical mission of dam safety was “buried too deep in the organizational chart to allow for the level of close senior management oversight warranted to protect the public trust.” The task force found that the program leader role warrants a significant upgrade in responsibility and authority.
In response to the Report, during May of 2021, the State legislature proposed $500M to address the issue statewide, but the amount brought to a vote was considerably less. Ultimately just $43M was approved, which was to be awarded at $15M per year. The City of White Cloud and the Village of Hesperia are recipients of these funds.
The Dam Safety Unit at EGLE was expanded, the administrative funding increased by $750K annually, seven engineers were added to the two previous, and the head engineer is now a dedicated supervisor.
Fixing the dams: Michigan is on an infrastructure support mission (May 31, 2024) – EGLE overview of their Dam Risk Reduction Grant Program’s involvement with Traverse City’s Union Street Dam project. This project provides examples of what can occur in Michigan when the Great Lakes Fishery Commission, EGLE, DNR and local government units and nonprofits work together.
Damming Decisions – Great Lakes Now – (YouTube 8:00 minutes) Learn about the Boardman River restoration and Traverse City’s Union Street dam removal and fish passage project.
Decade-Long Study Reveals Dam Removal’s Effect on River Ecosystem in Northern Michigan – In City of White Cloud’s consultant’s presentation on July 21, 2025 at the Special City Council Meeting, Aaron Snell reviewed his work on the Lake Kathleen Dam removal project as being potentially similar to White Cloud. This dam was located near Pellston, Michigan, on the Maple River. University of Michigan Biological Station.
Homestead Dam on the Betsie River, Manistee County, upstream about two miles from where US 31 crosses the river on the south end of Benzonia, Michigan (44.5962, -86.0799). A dam built to supply electricity to Benzonia, Beulah and Thompsonville was replaced with a fixed height dam where stacked weirs provide both Sea lamprey control and fish passage. The dam and adjacent property is owned by the Fisheries Division of the DNR. It now has the capacity to discharge 1,560 cubic ft. / sec., which is greater than the required 200-year flood rate of 1,200.
In the Hesperia Dam Feasibility Study Proposal Overview the Team Alternate Option might take a similar form. In Hesperia, there are already parks from above the current dam to well below that could be incorporated into the final design.