Proposed Straight Crest Dam with Four Gates (Option 2) superimposed over current site
Work Session November 10, 2025
After the September 16, 2025 Dam Open House held at the Hesperia High School, the Village Council and other Village staff met on November 10, 2025 for a twenty-five minute working session with representatives of G.E.I. Consultants of Michigan, PC. (GEI). At the work session project manager of the Hesperia Dam Rehabilitation Alternatives Analysis (the feasibility study funded primarily by a Michigan Department of Environment Great Lakes and Energy (EGLE) Dam Risk Reduction Grant, June 16, 2025) Dan DeVaun presented three options:
Option #1 – Fixed Labyrinth Weir style with no gates. Cost $17.6 million
Option #2 – Straight crest with four gates Cost $18.7 million
Option #3 – Smaller Labyrinth Weir style with 2 gates Cost $15.9 million
Earlier presentations indicate that all three replacement dam options would satisfy the goal for Sea lamprey control. In addition, two alternatives to allow fish passage were considered, each estimated to cost $1.5 million.
At the work session, Gretchen Trast of GEI addressed funding. She recommended ecological stewardship grants be the first targeted.
Village Council Meeting November 10, 2025
At the Regular Council meeting on November 10, 2025 that started minutes following the working session, Village President Mike Farber moved that the Council select Option #2. The recorded minutes indicating it would be easier to maintain. Even though it is the most expensive, he believed it would be the best option for the village.
The motion carried on a roll call vote, four to three.
Village Council Meeting March 9, 2026
From the minutes of the Council’s March 9, 2026 meeting we learn that the Village had sent out Requests for Proposals (RFP) on January 30, 2026, with a “bid tour” on February 12. Though not confirmed in these minutes, it has been reported that two firms attended the tour. The March 9 minutes do report that on March 5, GEI was the sole firm submitting a proposal.
At this next meeting of the Council, March 9, all members voted to accept the proposal submitted by GEI Consultants’ for Hesperia Dam Rehabilitation Design, Permitting and Grant Services. The proposal amount is $999,440. Village president Farber was authorization to sign.
Funding for the nearly $1.0 million design work, the estimated $18.7 million eventual dam replacement, and $1.5 million fish passage structure will come from grants. GEI under its design contract is to help Hesperia obtain the funding. The Great Lakes Fisheries Commission (GLFC), the advocate for the dam to serve as a physical barrier to Sea lamprey, will provide “a large percentage of the 10% match,” according to the minutes.
In 2024, EGLE granted Hesperia $270,000 for the Feasibility Study with a portion of the required 10% matching funds coming from GLFC. GEI was the selected firm that completed that study.
The March 9, 2026 minutes read as though the fish passage option that is located on the south side of the dam is their preferred choice, but it is still subject to reaching an agreement with the property owner.

Proposed Fish Passage South Side of Dam