Hesperia Dam and Hesperia Pond on South Branch White River
[MI00678; 43.573, -86.041; Downstream Hazard Potential: Significant; Owner: Village of Hesperia; Emergency Action Plan Required; Regulatory Authority: Part 315; Description: Earth dam with last major reconstruction in 1977, retired hydro with height of 11 ft., head of 8 ft., impoundment surface area of 50 acres, drainage area of 196 sq. mi., max discharge of 3,524 cubic ft / sec; Design Flood: 200 yr. with 4,400 cubic ft. / sec.; Condition Assessment: Poor]

This page provides access to the documents specific to Hesperia Dam and Division Ave Bridge. It is organized with the most recent item at the top. First time users may find it more informative to start at the bottom. This approach provides a history as the events unfolded.
The summaries are provided because many documents are technical. As to what has been included and to how it is explained, for this archive every attempt has been made to remain objective.
Some source material is availabe at Village of Hesperia website and their Facebook page.
Read more about Dams and Impoundments and White Cloud Dam
Hesperia-Report_DRAFT Dam Feasibility Study June 16, 2025 – Titled Hesperia Dam Rehabilitation Alternatives Analysis – Draft, and posted on the Village of Hesperia’s website on September 11, 2025. The 352-page study was completed by GEI Consultants of Michigan, P.C. for the Village of Hesperia under a $270,000 2024 EGEG Dam Safety Risk Reduction Program grant. The study explores options based on the priorities set during the November 4, 2024 meeting with the Village president and clerk, their consultant team, EGLE Dam Safety Team members, and representatives of DNR Fisheries Division and the US Fish and Wildlife Service.
Hesperia Dam Feasibility Study Project Partner Kickoff Meeting (November4,2024) – Obtained from presentation to the White River Watershed Collaborative – Minutes of meeting with Village of Hesperia village president Mike Farber and clerk Vicki Burrell; six representatives of GEI Consultants (this is the same firm that prepared the White Cloud Dam Feasibility Study); a representative from the villages on-going contracted engineering firm Fleis & Vandenbrink; Nicole Lexson, Great Lakes Fisher Commission, Marquette, Michigan, and currently their Sea lamprey infrastructure specialist; Mark Tonello, Senior Fish Biologist, Michigan DNR; and Lucas Trumble and Thomas Horak of EGLE’s Dam Safety Unit.
Hesperia was the recipient of an EGLE Dam Risk Reduction Grant Program grant in May 2024, in the amount of $270,000 to investigate the current condition of the Hesperia Dam on the White River. At a minimum, the Village would have had a 10% shared in the total cost, making the contract worth at least $300,000. The study is to identify, analyze, and assess risks. Initial tasks will focus on data collection through desktop exercises and field data collection. Remediation measures will be developed to address deficiencies and bring the dams into compliance with safety requirements.
In the minutes it appears that the Village officials see the primary goals to be dam safety and Sea lamprey control, but contrary to DNR recommendations, held that fish passage be considered secondary.
USFW indicated that the dam currently is not providing a complete block to Sea lamprey. Money saved by not having to treat the South Branch between Hesperia and M37 at White Cloud would free up Great Lakes Fishery Commission funding for use elsewhere.
In this meeting Village officials expressed concern that a fish ladder would impede fishing on the downstream side of the dam. The DNR countered that it would actually improve fishing by allowing fish to migrate upstream to breed, which ultimately increases the fish population as a whole. The minutes indicate that a public meeting may be needed to “alleviate concern” for Village residents on this disagreement.
EGLE expressed concern that a dam removal option is not being considered, recommending the study should entertain all options.
GEI Consultants had already begun field work, anticipating completion by end of November 2024. At this time, the draft of the study was to be ready for review as early as April 2025, and the final by May 2025.
Hesperia Dam Feasibility Proposal Overview (November4,2024) – PowerPoint presentation saved as .pdf. – Obtained from presentation to the White River Watershed Collaborative – In addition to items included in the minutes from the meeting, this presentation provides more detail on what the proposed study will provide: evaluations of the slope stability and a seepage analysis of the existing dam, the structural stability of the actual dam, and a hydrologic and hydraulic analysis that would include dam breach inundation mapping, incremental consequence assessment and inflow design flood selection. It appears that the study will be similar to that prepared for the White Cloud Dam.
It is unclear if the scope of the hydrology modeling will consider the relationship with the decision being made by White Cloud. What would be the impact if that dam is either restored or removed?
None of the three options discussed during this November 4, 2024 meeting included fish passage, only Sea lamprey control. At the time of the study, the Village may have been working on the assumption that having the Low Cost option would improve funding availability from the State for dam remediation. Recent presentations to the citizens of White Cloud suggest this may be wishful thinking.
The Minimal Operation option would require little to no gate operation. On several occasions, EGLE Dam Safety Team members have expressed reservation concerning the capacity of many owners to operate and maintain older dams. The third option, intended to provide Maximum Control, indicates that the gates and stoplogs would be used to improve U.S. Water Level Control. Though the presentation provides no details, maximum control may mean that a replaced dam could provide incremental flood protection to properties downstream. If this approach is selected, Hesperia as the operator would need to be capable of monitoring storm events to remove stoplogs in advance of a forecasted storm.
Finally, a Team Alternate Option includes as an Add-on for fish passage and public park improvements. WRWP considers this approach to be the minimum it would endorse. It could augment the draw of the current parks along the river.
Included in the list of contacts for the project are Mason Manuszak, EGLE Dam Safety Unit engineer responsible for the Dam Risk Reduction Program, and Chris Frelburger, of the Great Lakes Fishery Commission specializing in infrastructure.
Part 315 Dam Safety Inspection Report Hesperia Dam Crossing the White River (November 2021) – (72 pages) – As a “Part 315” dam, classified as having “significant hazard potential” to life and property downstream, and in accordance with the Michigan Natural Resources and Environmental Protection Act, 1994 PA 451 as amended, the Village of Hesperia is required to have its dam inspected every four years. For the 2021 inspection, the Village of Hesperia contracted Fleis & Vandenbrink (F&V), an independent engineering firm in Grand Rapids, who also serves the Village on other projects.
F&V recommended addressing significant seepage/leakage on the left/south berm area of the dam, a condition that appeared to have worsened since the last inspection. Though WRWP has not found confirmation from the Village, this condition appears to have been addressed, possibly in 2023.
Differential settlement was attributed to scouring and undermining of the dam’s abutments; the report recommends additional inspection with stoplogs removed. Among the list of other recommendations was repair of concrete cracks and spalling. The Inspection listed seven operational issues to be done by Village crews that include routine inspections, clearing of debris, and trimming vegetation to eliminate habitat for burrowing animals.
In conclusion, the engineering firm found, with the exceptions of the noted recommended repairs, the dam is otherwise in Fair Condition.
As to the spillway capacity, criteria set by Michigan law, the report states that it “is adequate for the structure to pass a 0.5% (200-year) flood event with the dam being slightly overtopped during the design event. Due to the configuration of the dam downstream of the Division Street Bridge, it is anticipated that a flood event larger than the 0.5% would be required for the dam to actually experience the 0.5% flow rate, as the bridge is anticipated to act as a restriction to the flow during events of a design-type magnitude.”
Said another way, were a “design flood” to occur, the Division Street Bridge becomes the functional dam. The opening under the bridge sets the limit to the amount of water passing. It turns out that the bottom chord of the Division Street Bridge (I-beam holding it up) is about 8” below the elevation of the emergency spillway of Hesperia Dam.
The Emergency Plan (see below) say the flow rate at the dam during the 1986 flood was about 2,900 cubic feet per second (CFS), well below the 200-year storm rate of either 4,400 or 4,600 CFS, given in the Inspection Report or Emergency Plan. To save the dam (and bridge?) from the 1986 storm, the northern berm was “mechanically breached.” Following the 1986 flood, the emergency spillway (and swimming pond) were built. The emergency spillway is included in the flow rate calculations needed to bring Hesperia Dam into compliance with Michigan standards. By all accounts, the bridge with the vulnerable bottom chord was already there when the emergency spillway was added. The bridge somehow endures as the river over topped into the emergency spillway in 2013, 2014 and 2018.
The June 2025 drawdown of Lake White Cloud provides protection to the Hesperia Dam and Division Street Bridge, with White Cloud Dam providing increased storm water storage and buffering the peak flow. To explain, rain from a thunderstorm stands to reach the impoundments more rapidly than rain from a slow-moving weather front. Different types of land cover influence both the rate and quantity. As one might expect, hard surfaces in urban areas produce high rates and large quantities. Still runoff from agricultural land is subject to tilling practices, even crop selection. Finally, if the ground is saturated, as may have been the case in 1986, a lot more of the rain runs off and arrives at the impoundment sooner and in a bigger wave. For these reasons, it is important to look at more than just the two dams. Studies have already warned that the foundations of M20 Bridge east of downtown White Cloud are prone to scouring as soon as Lake White Cloud is drawn down. To that add about two dozen more bridges downstream that may need to span greater peak flows. Can they? Fortunately, the spade work has been done. EGLE grants have funded extensive hydrology/ hydraulic modeling in the two Disposition Feasibility Studies. Finally, it should not be overlooked that when White Cloud dam is removed, for either good or replacement, there will be higher peak rates as well.
Hesperia Dam is intended to stop Sea lamprey from going further upstream. However, a July 5, 2001 article from the Oceana’s Herald Journal included in F&V’s report indicates U.S. Fish and Wildlife Service (USFWS) from Ludington made concrete repairs and replaced leaky stoplogs when the impoundment had been drawn down for repairs to the bridge on Division Street. Denny Lavis, USFWS station supervisor is quoted, “We have just completed an expensive lampricide (killing lampreys with chemicals) program on the upper portion of the White, between White Cloud and Hesperia. It is a lot cheaper to control the lampreys with a barrier than with lampricides.” Treatments in the South Branch White River have continued every three years, working downstream from M37 near White Cloud Dam.
In March 2009, according to a story within the Inspection Report, the Hesperia Department of Public Works averted a “potential washout” from a “slush jam” that got to within “a couple of inches from the top” of the dam.
Hesperia Dam Emergency Action Plan – Under Michigan Natural Resources and Environmental Protection Act (NREPA), 1994, Part 315, Dam Safety, the Village of Hesperia, as owner of a Significant Hazard Potential Dam, is required to prepare and keep current an Emergency Action Plan. This link is to a plan completed in July 1998, but is the most current available from Oceana County Emergency Management. The plan addresses the steps that the Village, their Department of Public Works and other governmental units, such as Oceana County Emergency Management, Sheriff, and Michigan State Police will need to take in the event “dam failure is imminent or has occurred.” It includes the notification list by private property parcels downstream of the dam. They extend through Newfield and Greenwood Townships.
According to analysis done prior to the 1998 Hesperia Dam Emergency Action Plan, the dam could not handle the flood of 1986 that had a flow rate below the 200-year design storm flow.